Power Factor Test Sets | Tan Delta

29, Apr. 2024

 

Power Factor Test Sets | Tan Delta



Advanced Test Equipment Rentals stocks equipment that can measure power factor and tan delta of your system. You can determine capacitance and dissipation at varying frequencies and identify any age degradation or impurities sooner, before the damage becomes irreparable. Advanced Test Equipment Rentals carries power factor and tan delta test equipment from top manufacturers like Tettex, Megger, OMICRON, Doble, and more. Power factor and tan delta test equipment can be applied to power transformers, instrument transformers, bushings, capacitors, circuit breakers, and surge arrestors. 


Read more on Power Factor Testing Applications

Power factor and tan delta testing, the process of measuring capacitance and dissipation, helps you determine the condition of a system’s insulation in bushings or between windings. As time wears on, insulation of a system will begin to degrade, or impurities like dirt and moisture may start to compromise it. This will create a conductive path to the current, consequently leaking electric current flowing through the system and reducing capacitance. Ideally, the aim is to keep the ratio of resistive component to capacitive component of an insulator low. This ratio is known as tan delta, or dissipation factor (power factor).Advanced Test Equipment Rentals stocks equipment that can measure power factor and tan delta of your system. You can determine capacitance and dissipation at varying frequencies and identify any age degradation or impurities sooner, before the damage becomes irreparable. Advanced Test Equipment Rentals carries power factor and tan delta test equipment from top manufacturers like Tettex, Megger, OMICRON, Doble, and more. Power factor and tan delta test equipment can be applied to power transformers, instrument transformers, bushings, capacitors, circuit breakers, and surge arrestors.

Check now

Diagnostic Testing and Condition Assessment of Hydro- ...

After performing condition assessments, inspections, testing, and repairs of generators I have discovered that the more I learn, the less I realize that I really know. Generators are a very complicated machine and have a unique insulation system in which you manage PD, rather than eliminate it.

I will digress for a moment,

Previously I had mentioned that I ‘chose’ to be an engineer. As a young child growing up in Saskatchewan, my father liked to travel. I remember visiting the WAC Bennet Dam and G.M.Shrum generating station during these travels. This was before the Peace Canyon Dam was built. I have pictures showing how we were allowed into the underground powerhouse during the tour and we were able to look down into the control room when it was still a fishbowl. Times have changed significantly.

During 911 I was managing a power station on the Columbia River and remember hearing about this terrible event when I arrived at work. Very little information was available at the time, but we could see the military flying overhead, directing the local heli-logging operations to land immediately. Those events changed the world forever and we still live in the shadow of the terror that resulted.

Once again, I will pull out that soap box. And so, my tale continues . . .

I thought I would share some experience with conducting testing of generators during condition assessment. There is much fear among experts of sharing information because they think it will take their power away. My own experiences showed that the people I most respected, always freely shared their knowledge. Without this, we would never have left the dark ages and progressed forward with Universities.

Information about the generator is required to prepare a good test plan which would include:

  •  winding diagram,
  • machine rating,
  • capacitance of the winding,
  • previous test results,
  • TCT\VET results.

The winding capacitance is required to calculate the correct high voltage power supply size and can typically be obtained during the IR/PI testing.

Previous test information is required to establish good trends. Much information on the resins used, and characteristics of windings is not available. Given the very small statistical sample for hydro-electric generators, and their site-specific designs for larger units, some judgement is typically required during evaluation and this helps the process.

Although I have used a variety of equipment over the years during testing, I can suggest that the following equipment has performed satisfactorily from my perspective,

  • For PD testing I have been using the Omicron system including MPD 600, CAL542, and associated MCU.
  •  For Tangent Delta testing I have been using the Omicron system MI600 and associated MCU.
  • For resistance measurements I have been using the Omicron CPC 100.
  • For insulation resistance and polarization index measurements I have been using Megger products such as the MIT1025.
  • For low-light conditions, I have found the Corona Finder is a fantastic instrument for visualizing corona taking place within switchgear and stator windings.
  • For ultrasonic location and transient earth voltage measurements, EA Technology makes the UltraTEVPlus which includes a gooseneck microphone, parabolic mic, ultrasonic contact probe, environmental measurement and TEV measurement.

Other equipment you will need would include:

  • Resonant test set. It is difficult to find PD free supplies anymore, however, using a high voltage PI filter on the output can reduce the PD levels.
  • PD coupling capacitors. IEC frequencies are typically acceptable for offline testing and 1,000 pF coupling capacitors would work.
  • A low loss reference capacitor is required for capacitor bridge measurements.
  • An HFCT is also helpful.

Qualitrol can provide equipment for the following:

  • El Cid core test
  • Stator Wedge Analyzer Test
  • DC Ramp Test


1      Introduction

This is a suggested approach to diagnostic testing and condition assessment of a 13.8 kV hydro-electric generator stator winding. It is not the only way, but it will provide very comprehensive results. The principles used here can also be applied to turbo-generators and motors. I prefer using instruments which have recording capabilities and use datasheets to summarize the field test results and act as a checklist for some procedures. I’ve also included some information on what I can learn when analyzing the results.

Electrical diagnostic testing for the stator winding and core include:

  • Insulation resistance (IR) and polarization index (PI) testing at 5.0 kV DC.
  • Capacitance (C) and dissipation factor (DF) from 2.0 to 8.0 kVLN.
  • Off-line partial discharge (PD) testing at 8.0 kVLN AC.
  • PD localization using ultraviolet, ultrasonic, or electromagnetic techniques.
  • Partial discharge inception voltage (PDIV) and extinction voltage (PDEV).
  • Electromagnetic probe (TVA) survey of the winding, at a voltage of 8.0 kVLN.
  • Monitored (PD) AC Withstand test performed at a minimum of 17.25 kV.
  • DC overvoltage test to a minimum of 29 kV.
  • Winding resistance measurement.
  • Stator slot wedge tightness.
  • Stator core low energy stator core flux test (ElCid).

A visual inspection of the winding should be performed to assess the condition, note anomalies, and document visual evidence of problems.

Personnel performing the testing should be trained and qualified for performing HV testing and knowledgeable of visual inspection. All measuring and test equipment should be in calibration. Test anomalies should be investigated at the time of testing. Calibration certificates should be National or International bodies and available upon request.


2      Required Standards, Codes & Specifications

  • IEEE 4               Standard Techniques for High-Voltage Testing
  • IEEE 43             Recommended Practice for Testing INsulation Resistance of Electric Machinery.
  • IEEE 62.2          Guide for Diagnostic Field TEsting of Electric Power Apparatus - Electrical Machinery.
  • IEEE 95             Recommended Practice for Insulation Testing of Large AC Rotating Machinery with High Direct Voltage.
  • IEEE 286           Recommended Practice for Measurement of Power Factor Tip-Up of Electric Machinery Stator Coil Insulation.
  • IEEE 1434         Guide for the Measurement of Partial Discharges in AC Electric Machinery.
  • ASTM D1868    Standard Test Method for Detection of Partial Discharge (Corona) Pulses in Evaluation of INsulation Systems.
  • IEC 60034-27    Rotating elctrical machines - Part 27: Partial discharge off-line measurements on the stator winding insulation of rotating machinery.


3      Precautions

Rotating machinery testing involves the application of high voltages to machine windings. These windings have capacitive and inductive properties that can lead to hazards that may not be readily apparent. Test personal should be familiar with the hazards associated with the testing. The test setup should conform to all local safety codes.

The following general requirements should be considered when performing testing:

  • Posted signs
  • Observers (Centurions) posted to prevent unauthorized access to the test area.
  • Safety barriers to prevent unauthorized access to the test area.
  • Maintain limits of approach as prescribed by CSA Z462 .
  • Test connections should be visible to the tester during the test.
  • The test set should be connected to the machine prior to removal of grounds.
  • Although test equipment may perform grounding of the apparatus at the conclusion of the test, the winding should be treated as alive until grounds are applied.
  • The area within 3 meters (10 feet) of the test leads and winding under test should have all spare parts, pieces of equipment, tools, etc. removed.

The following should be considered when performing DC testing:

  • Application of high direct voltage results in a stored charge in the capacitance of the winding under test. It must be recognized, that eliminating the test source will not remove the stored charge from the winding. Machines that have been tested with high direct voltage must be fully discharged or grounded before being handled by personnel. 
  • If the ground connection is removed before sufficient time has elapsed, a recovery voltage may build up which can be dangerous to personnel who might contact the winding or be damaging to the insulation integrity if it were placed in service or subjected to subsequent tests.

Consideration should also be given to the following by the equipment owner:

  • Station personnel should perform a pre-test IR/PI measurement on each phase to verify that the minimum criterion is met prior to mobilization of a test crew.
  • Sensitive test equipment will be used during testing and will require protection from rainfall during testing for outdoor installations.
  • The test should be scheduled so that the winding temperature throughout the test will remain steady, and a few degrees Celsius above the dew point of the ambient temperature. The winding temperature should be at or below 40°C and at least 5°C above ambient temperature. For winding temperatures below the dew point, it is difficult to predict the effect of moisture condensation on the surface, therefore an attempt to correct to 40 °C for trend analysis would introduce an unacceptable error.
  • PD performance of stator windings is affected by humidity conditions and testing under similar is recommended to ensure constancy of results. Seasonal variations in PD performance also do occur due to different temperature ranges and humidity levels.
  • New or repaired windings, coatings, varnishes, potting compounds, bonding resins, other coatings should be completely dry and cured before tests are performed. Partially cured epoxy is conductive and will prevent high voltage testing and can be noted during IR/PI testing.
  • When performing inspections or electromagnetic probe (TVA) testing, identify at least every fifth slot number and the location of the phase end and neural end connections in a visible location on the windings and\or wedges– where ever possible obtain a winding diagram and apply the slot numbers corresponding to the diagram to ensure correct interpretation of results. Occasionally during construction, the mechanical slot 1 and the electrical slot 1 are different.
  • Generator stator winding is electrically isolated with the high voltage leads disconnected and the neutral leads disconnected. The stator winding should be disconnected from all external bus connections and auxiliary equipment such as the voltage transformers, surge arresters, surge capacitors, current transformers, exciter transformer, neutral transformer, and unit transformer. PD originating from the isolated phase bus, bushings or CT’s within the test circuit can result in incorrect interpretation of test results.
  • Thermocouples, RTDs, and stator slot couplers (SSC) should be grounded and machine line and neutral CTs located within the test circuit should be shorted and grounded. Some of these devices may act as a source of PD during testing if not grounded.
  • Clean all insulation surfaces of support blocking and support insulators located at both the neutral and line connection end of stators windings which are within 30 cm (12 inches) of bare conductor. Cleaning can be performed by wiping the area with a clean, lint-free cloth that contains a small amount of an approved cleaning agent (such as isopropyl alcohol). Allow the area to dry before commencing the test. Contamination in these areas will affect C&DF measurements and DC Hipot leakage currents. Typically, at least seven inches of air clearance is required . Silicon high voltage material can be used to provide isolation from ground in locations where inadequate clearance exists with the ground plane that could result in PD activity or affect DC leakage currents.
  • When corona probe (TVA) testing is performed, the rotor should be removed for unrestricted access, or the air gap should be accessible. Rotor mounted fan blades or the generator cover H frame can restrict access with a test probe in cases were the rotor is not removed.
  • The rotor should be removed when performing an ElCid test.
  • When stator testing is performed with the rotor installed, the rotor field leads should be shorted and grounded, and the rotor body should be grounded.
  • Discharge the winding completely to its grounded frame for at least 40 minutes prior to the insulation resistance and polarization index test because residual charges from previous testing can lead to measurement error. This is very noticeable if you perform a 1 kV IR\PI measurement, followed by a 5 kV IR\PI measurement.
  • DC withstand leakage currents can be affected by DC testing if sufficient grounding time is not allowed when changing phases.
  • Safety of the plant under test is a consideration. Any failure to meet pre-requisites such as those contained in IEEE 43 or other standards requires the testing be stopped and the matter should be referred to the test engineer. It is at the discretion of clients to take a risk relating to plant equipment safety; however, during IR\PI and Hi-Pot testing can create a dilemma if testing is halted. Usually I consider aborting a test to have the same meaning as a test failure; the equipment is unsuitable for service.

Prior to starting testing, consideration should also be given to the following:

  • Obtain electrical and mechanical clearances and/or work permit from the respective authority prior to test along with.
  • Ensure that the equipment is properly isolated and grounded.
  • Ensure that any additional signs or barriers required to restrict access to authorized personnel during the winding under test are in place.
  • Perform Field Level Hazard Assessment

 

4      Test Method

4.1    Insulation Resistance and Polarization Index Test

Check the insulation resistance (IR) of the stator windings in accordance with IEEE standard 43. Testing is a requirement to ensure a minimum insulation resistance prior to proceeding with diagnostic testing. Table 4 of this standard indicates the minimum recommended insulation resistance, in MΩ at 40°C, of the entire machine winding (all phases) of 100 MΩ as a prerequisite for further testing.

Both single phase and three phase testing are required for assessment of the condition of the insulation system. Comparison of test results can indicate if problems with respect to ground or between phases exist. Typically, the slot section can have problems to ground while the end arm region can have phase to phase problems.

4.1.1    Test Procedure

The following procedure is suggested as an approach to Insulation resistance measurements:

  1. Before any testing is conducted, the winding insulation must be discharged. Residual charges from DC testing can lead to measurement error.
  2. The temperature of the winding must be recorded at the time of the test. Temperature will be used to correct winding insulation resistance to a temperature of 40°C.
  3. Attach one of the test leads (preferably the positive lead) to the grounded machine frame, the other test lead (preferably the negative lead) to the winding terminal. 
  4. Remove the machine ground and begin the test. The operator should carefully watch the display on the test set for any indications that problems may occur.
  5. The test set will remove the test voltage automatically and display the relevant data which should be recorded on the test report sheet.
  6. Replace the machine ground before disconnecting the test set.
  7. When performing single phase testing, wait at least 5 minutes before proceeding with the test on the next phase. Residual polarization in the insulation will affect test results and some insulations may require a longer discharge time.
  8. Repeat steps 3 to 7 for the remaining two phases
  9. Repeat steps 3 to 7 for the three phase configuration.

4.1.2    Analysis Tips

Plotting of the insulation resistance over the life of the machine (after correction to 40°C) will allow recognition of some problems.

  • Increases in leakage currents may be the result of insulation deterioration or contamination
  • Comparison of leakage currents between single and three phase results will allow detection of deterioration in the end arm region.


4.2    Capacitance and Dissipation Factor (tan δ) Test

Both single phase and three phase testing are required for assessment of the condition of the insulation system.

Tan δ testing evaluates various factors that influence the performance of the overall electrical insulation. Bridge techniques should be employed to properly measure and assess the extent of pulseless and pseudo glow discharge activity. Testing is performed in accordance with the requirements of IEEE 286 on each phase at up to rated line to neutral voltage.

4.2.1    Test Procedure

The power factor tip-up is defined as the difference in the power factor measured at two voltages. The test plan below is shown in Figure 1. A typical test setup is shown in Figure 2.

Figure 1: C & DF Test

The following procedure is suggested as an approach to dissipation factor (and capacitance) voltage characteristic measurements:

  1. The temperature of the stator insulation during the test should be measured and recorded.
  2. If the winding is exposed to the atmosphere, the ambient temperature and relative humidity should be recorded.
  3. Slowly raise the voltage to rated voltage using a steady movement of the control dial over 30 seconds.
  4. The conditioning voltage, equal to the coil voltage rating (8 kV), should be applied to the coil for 2 minutes.
  5. Immediately after the conditioning time, the dissipation factor and capacitance are recorded.
  6. Slowly lower the voltage to zero voltage over 30 seconds.
  7. Raise the voltage to the lowest test voltage (2 kV), the dissipation factor and capacitance are recorded.
  8. Reduce the voltage to zero.
  9. Repeat steps 3 to 8 for the remaining two phases
  10. Repeat steps 3 to 8 for the three-phase configuration.

Figure 2: Typical C&DF Test Setup using an Omicron System

4.2.2    Analysis Tips

The basic tip-up characteristic is calculated from the change in dissipation factor between operating voltage the lower test voltage. The 8 kV measurements will include pseudo-glow, internal PD, and corona losses, while the measurement at 2 kV should only be related to the dielectric loss and leakage currents.

Plotting of this information over the life of the machine will show how the dielectric characteristics and non-linear losses change over time. Cleanliness of the machine will also have a substantial effect on the results of the testing due to how leakage currents in the end arm regions are affected.

Comparing differences between the single phase and three-phase losses will allow examination of effects within the end arm region of the winding, in a similar fashion to PD testing.

The original factory test results prior to assembly should be consulted for guidance in interpretation of the measurements.

Careful comparison of the curve with the PD inception and extinction voltages will show the total losses relate to sparking type discharges. During off-line testing, PD measurements using capacitive couplers are typically limited to PD measurements at the machine terminal while dissipation factor is sensitive to the entire winding.


4.3    Off-Line Power Frequency Partial Discharge Test

Off-line PD testing evaluates various factors that influence the performance of electrical insulation associated with sparking discharges near the terminal region of the stator winding. Testing should be performed in accordance with the requirements of IEEE 1434. The test plan is shown in Figure 3.

Figure 3: Partial Discharge

Measurement of the partial discharge quantities QIEC, as well as extinction voltage and inception voltage are required using coupling capacitors installed at both the line end and neutral end of the winding for simultaneous measurements. Each is calibrated individually and the attenuation through the winding can also be measured. Measurements of leakage currents from grounded phases using HFCT will assist with analysis. Testing should be performed in a single-phase configuration, and when possible in a three-phase configuration. The test set-up is shown in Figure 4.

Figure 4: Typical PD Test Setup for Single Phase testing

As the test voltage does not approach the hipot level, it is preferred to connect the test voltage supply to the neutral terminal of the winding under test, without shorting the line and neutral terminals together.

The coupling capacitor should be connected to the line and neutral terminals. This will allow the stator core to filter out any influence from the power supply and allow the most accurate PD measurements at the line terminals. In some rare cases the test set-up may need to be reversed to allow more detailed investigation of the neutral end of the winding. Refer to Figure 5 for configuration of the test equipment.


Figure 5: Typical PD Test Setup using an Omicron System

The connections between the coupling capacitors and the winding under test should be kept as short as possible and high-voltage leads should be of sufficient diameter to not produce PD during the test.

4.3.1    Test Parameters

Partial discharge extinction voltage (PDEV): The highest voltage at which partial discharges (PDs) above some stated magnitude (which may define the limit of permissible background noise) no longer occur as the applied voltage is gradually decreased from above the inception voltage

Partial discharge inception voltage (PDIV): The lowest voltage at which continuous partial discharges (PDs) above some stated magnitude (which may define the limit of permissible background noise) occur as the applied voltage is increased.

Largest repeatedly occurring PD magnitude (QIEC):  The largest magnitude recorded which has a pulse repetition rate of 10 pulses per second, which can be directly inferred from a pulse magnitude distribution measured in the frequency range of 250kHZ±150kHZ.

4.3.2    Test Procedure

  1. The temperature of the stator insulation during the test should be measured and reported.
  2. If the winding is exposed to the atmosphere, the ambient temperature and relative humidity shall be recorded. Testing is not recommended within a hydrogen atmosphere; dew point and pressure should be recorded.
  3. For QIEC measurements, the measuring system should be normalized in terms of apparent charge at the winding terminal, to which the coupling capacitor is attached.
  4. Measurements of the background noise should be made just to ensure background noise is minimized.
  5. Slowly raise the voltage to rated voltage using a steady movement of the control dial over 30 seconds.
  6. The conditioning voltage, equal to the coil voltage rating, should be applied to the coil for 5 min.
  7. Immediately after the conditioning time, record the partial discharge quantity. Hold voltage for 30 seconds to allow post-analysis of the partial discharge patterns.
  8. Slowly lower the voltage to zero voltage using a slow, steady movement, while noting the partial discharge extinction voltage
  9. Raise the voltage to rated voltage using a slow, steady movement, while noting the partial discharge inception voltage.
  10. Reduce the voltage to zero.
  11. Save the automatic record and record the file name.
  12. Repeat steps 3 to 10 for the remaining two phases.
  13. 13. Repeat steps 3 to 10 for the three-phase configuration.

4.3.3    Analysis Tips

PD tests have origins as a rewind criterion and have evolved into a diagnostic or condition assessment tool, as well as, a maintenance tool. My preference for performing an off-line partial discharge test was using capacitive couplers located at the line end and neutral end of the machine.  The remaining two phases were grounded, and the ground lead was monitored with a HFCT.

  • The capacitive couplers would identify any partial discharge sources within the winding; however, due to attenuation from inductance in the slot section, sensitivity is generally limited to the first coil group. Any sources of partial discharge in this region should be detectable. Partial discharge from sources further away is typically buried in the patterns measured.
  • The HFCT would characterize the partial discharge which was taking place phase to phase. The HFCT would have better sensitivity throughout the entire winding since the return path for the partial discharge pulse was typically through the ground lead.

The model for a generator is very complicated, with impedance mismatches between the end windings and slot sections which result in many reflections.  Cross coupling of partial discharge through the end arm regions bypasses the core section. Poorly designed circuit ring taps or ring busses can also be a source of partial discharge when the line and neutral rings are in close proximity.

Some may argue that it is not possible to calibrate for apparent charge due to the complex impedance but using the same calibration procedure and instrumentation during subsequent testing will ensure repeatable results. 

While in service the winding has voltage that increases from zero at the neutral connection to rated voltage at the line connection. Off-line testing will subject the entire length of the winding to the test voltage. Off-line partial discharge measurement does not have the same voltage distribution within the winding that would occur while a generator is in service. It will identify weakness in the entire insulation system that may not be detectable with an on-line system. Since these two types of tests are done under different voltage distributions, the results are complimentary and can assist with analysis of problems when compared.

During testing I have been able to identify partial discharge sources located both at the line end of the winding and at the neutral end of the winding. The localization of line end portions can be aided through physical indications of white powder deposits or use of a device which amplified light in the ultra-violet spectrum generated by corona (Corona Finder). White powder was typically limited to the last 10% of the winding closest to the tine ring bus during normal operation, while corona could be observed along the length of the winding during testing. Neutral end problems were typically buried in locations where the winding was in close proximity to windings at line potential. Typically, the first crossover between the high voltage end and the neutral end would show evidence of partial discharge activity, while all crossovers would typical be visible in the ultra-violet spectrum. The end arms of windings would typically show problems at the first coil group; however, all closely spaced groups would show visible corona during off-line testing. Evidence would also be visible in the ring bus where spacing was not maintained.

Comparison of the single-phase and three-phase measurements will show how much PD will be taking place in the end arm regions. Design problems which result in PD from inadequate kickback between the front and back coils, from crossovers in the end arm region, inadequate spacing between end arms between slots, and inadequate spacing in the ring bus will be detectable. The three-phase configuration will result in a reduction PD resulting from phase to phase stress and only Corona and slot PD. I have successfully proven that PD measured was only within the end arm region using this methodology.

The HFCT would show how much partial discharge was taking place between windings. This could be in phase to phase locations already discussed, or through cross-coupling of ‘fast’ PD events.

Measurements within a hydrogen atmosphere will result in measurements much lower than those that would be obtained in air for the same winding.

Humidity has a significant impact on the level of corona that can take place. High humidity environments will result in much lower measurements than would occur in very low humidity environments. Seasonal changes should be considered in the evaluation and it is preferred to perform the testing under the same conditions.

During testing, high background noise can be a problem. Arc Welders and grinding activity are examples of noise sources. Some can be eliminated by installing an RF filter in the power supply; however, some can only be eliminated by performing testing while other activities are not being performed.

For a maintenance flavor, I would suggest investigating how RTV affects PD performance.


4.4    Electromagnetic (Corona or TVA) Test

Corona probe testing evaluates various factors that influence the performance of electrical insulation within the slot section of a stator core associated with sparking type discharges which could result from insulation delamination, insulation voids, and degradation of the semi-conductive treatment. Testing is performed in accordance with the requirements of IEEE 1434.

When performing the TVA probe test with the rotor in place, there needs to be enough room in the air gap to allow inserting the test probe. The test probe needs to maintain contact with the core. The operator must maintain limits of approach from the ring bus, end windings, and group jumpers. Rotor mounted fan blades or the generator cover H frame can restrict access with a test probe in cases were the rotor is not removed.

Single phase testing is required. During testing of each phase, all slots containing a stator coil in either the top or bottom of the slot are scanned. The slots are typically divided into two or more sections based on test ergonomics.

It is recommended that an AC overvoltage proof test in accordance with IEEE 62.2 section 7.1.5 of at least 1.10 to 1.25 times the rated line-to-neutral voltage of the machine has been performed prior to performing a TVA probe test. This overvoltage test provides some assurance of the integrity of the winding being tested. Care must be taken to ensure that this test does not result in conditioning which reduces the test values.

Hengfeng are exported all over the world and different industries with quality first. Our belief is to provide our customers with more and better high value-added products. Let's create a better future together.

4.4.1    Test Parameters

The recommended target voltage for the TVA probe test is the rated line to ground voltage Vln. If relatively high PD readings are obtained, measurements may be made at lower voltages to determine the expected PD activity at operating voltage of specific coils/bars within the winding. If consistently high TVA readings are obtained, then reduce the test voltage to a suitable level to obtain sensible readings

The ferrite core used in the test assembly is very important to achieving correct measurements. Some instruments have interchangeable probes to allow testing with the rotor removed or with the rotor in place. Each probe is carefully designed to ensure measurements remain consistent.

Positioning of the probe will affect test results. Small changes in the gap between the probe and core can have profound changes to measurement. Typically, the ferrite core is insulated with a material having a known thickness to ensure consistent readings when the probe is in contact with the core. Wedges which are proud of the iron surface present challenges because proper contact of the probe may not be possible.

Measurements are very localized within the slot section due to how PD signals propagate within the slot section. Measurements can change as you move from core tooth to core tooth. The entire slot needs to be scanned as a result. My preference is to record the core with at least 2 equal portions. For Turbo-Generators, ergonomics will require it to be broken into more sections that are about one meter each. One person is required to position and move the probe at a slow and steady pace, while the second person observes the instrument and records maximum readings for each measurement section. Locations of measurement anomalies should be marked with an ‘x’ for visual examination at the conclusion of the test.

A field verification that the instrument is functioning is required as no other field check is performed. The instrument should also have a valid calibration certificate. My own preference is to inject a known pulse into a ‘U’ shaped ferrite core that is held in contact with the TVA probe. Each scale on the instrument could then be checked to determine that it’s reading conforms with the expected quantities.

High voltage gloves may be required when holding the TVA test equipment. Evaluation of approach limits with the end winding, and ring bus should be considered. Maintain limits of approach as prescribed by CSA Z462 with the stator end windings

4.4.2    Test Procedure

1.   Raise the voltage at the rate in accordance with the recommendations of IEEE Standard 4 up to the prescribed test voltage.

Observe a minimum 2-minute conditioning period prior to beginning testing. Note: Pre-conditioning of the stator winding for a period of up to 1 hour before making any measurements may be required, especially in the case of thermoplastic insulation systems.

2.   Carryout a scan of the total length of each slot in turn.

  • Under no circumstances should the ground be disconnected from the TVA Meter or the TVA probe unplugged from the meter with the stator winding energized. Confirm ground lead is secure before starting test.
  • Do not use the TVA probe beyond the end of the stator core iron.
  • Record the highest PD reading in the slot observed in each section, typically a section is a meter long.
  • Record the order in which the measurements of the slot PD are made.
  • Repeat the initial slots tested to establish if there is a time dependent PD phenomena.

Note: Any smell of ozone and if considered excessive and test should be stopped, and appropriate safety equipment should be used.

3.   If any high TVA readings are obtained, note and mark the position.

  • Reconfirm high readings at the end of the test
  • Lower the test voltage to establish the highest voltage at which partial discharge no longer occurs and record this PD extinction voltage (PDEV).
  • Increase the test voltage to establish the lowest voltage at which continuous partial charges occurs and record this PD extinction voltage (PDIV).
  • Note this test voltage on the record sheets and make immediate reference to the test Engineer.

4.   Reduce test voltage to zero, turn off high voltage power supply and apply ground to stator winding. 

5.   Repeat steps 1 through 4 for each phase of the winding as required.

4.4.3    Analysis Tips

Just as with PD testing, there is also extensive coupling between windings during the TVA probe test. Adjacent slots which contain only windings from grounded phases will test positive using the TVA probe and reference to the winding diagram during analysis is essential.

Once the probe slides past the end of the core, a step change in measured values will also occur because of all the PD activity is now being measured in the end arm region.

Some increase in PD signal can also be observed at the very end of the core due to the grading\Semi-Con interface.

My preference for analysis was to create a spreadsheet with the winding map, showing the phase to ground voltage of each leg of the winding. It would also show the voltage difference between the front and back coils when in normal operation. This mapping would then generate a test sheet which indicated which slots needed to be tested as each phase was energized individually. This information would allow those performing the test to quickly identify measurements which were of greatest concern and perform a more detailed visual inspection of the area. Typically, high phase to phase voltages and high phase to ground voltages are of interest. Sometimes the pattern of X’s left behind can show a geometrical relationship.

My preference for presentation of the information was to provide readings in a couple of graphical formats.

  • Graphing of the results by slot number would show if there were any geometrical considerations that could be causing unsatisfactory readings.
  • Graphing by stator bar\coil voltage would show if there were any affects which resulted from the voltage the bar operated at.
  • I would also look at the test results to see if there were any results which correlated to the maximum voltage differential between the front and back bars.

Normally, there should be some increase in readings as the voltage increased, with the 10% of the winding at the line end having the most deterioration. Abnormal results could be associated with the maximum voltage difference between the front and back bars, those connected to the line voltage, or due to geometrical considerations. These would need to be analyzed to determine what was the root cause is.

IEEE 492 and IEEE 1434 do provide some additional guidance. 


4.5    Monitored AC Overvoltage Withstand Test

AC testing results in the highest stress levels of the insulation system within the slot section of the stator core. Acceptance test levels for new machines are 2E+1, while typical maintenance levels are 1.25-1.50E (E = Rated line to line voltage). 1.1E is end of life.

Withstand testing provides some assurance that the winding insulation has a minimum level of electrical strength required to successfully operate for the expected design life or certain period of time. Testing is performed on each phase in accordance with the requirements of IEEE 62.2 on each phase for one minute, with the remaining phases grounded. Partial discharge measurements are recorded at the withstand voltage level during the test.

Monitoring of partial discharge during higher than normal AC testing allows maintenance staff to understand potential weakness in the design of the machine and take corrective action before permanent deterioration of the insulation system occurs. Once the deterioration does occur, it is irreversible. As the insulation ages, partial discharge will occur at lower and lower voltages. Measurements at operating voltage will indicate on-line performance problems

The AC test will typically use a resonant test set to provide 60 Hz power for testing the stator windings; ergo the requirement for knowing winding capacitance. With the size of generators (e.g. capacitance) growing larger and larger, it is becoming increasingly expensive to provide test sets which can test an entire phase at one time. Luckily, the well-informed designer is able to take advantage of the machine design and split the insulated portion of the winding into two or four segments at the isolation points for the line and neutral connection. This allows testing of these larger machines with existing 500 KVA power supplies during acceptance testing, and much smaller test sets for maintenance testing. I have observed some large machines can be 2µF.  An RTS capable of energize 0.5µF at 20kV isn’t much larger than an oil barrel and can be powered by a wall plug of 120V at 15A, while a supply capable of energizing 2.1µF at 25kV or 0.65µF at 45kV needs 120A at 208V and is more like a Mini-Cooper.

4.5.1    Test Parameters

Acceptance test level for new machines is 2E+1, while typical maintenance levels are 1.25E to 1.50E (E = Rated line to line voltage).

4.5.2    Test Procedure

1.   When performing acceptance level testing of 2E+1, a spark gap should be used. Set the sphere spacing for a voltage 10% higher than the selected test voltage prior to final connection to the machine. Usually this can be verified with the test set before connection to the generator.

2.   Raise the test voltage slowly from zero to the selected voltage. It should be raised sufficiently slowly to permit accurate reading of the measuring instrument, but not so slowly as to cause unnecessarily prolonged stress on the test object at the test voltage. These requirements are met in general if the rate of rise above 75% of the estimated final test voltage is about 2% of the test voltage per second.

3.   Once the selected voltage has been reached, the applied voltage is held on the test object for a period of one minute. Corona activity may occur during the time of holding the applied voltage.

4.   Once the selected voltage is held for one minute, the applied voltage should be reduced to zero over a period of five to ten seconds.

4.5.3    Analysis Tips

Traditionally this test is either a pass or fail test. When performed with a series resonant test set, trending of energizing current with respect to time may reveal additional information.

Analysis of PD patterns recorded during testing will give an indication of potential problems. This may be related to activity in the slot section, inadequate spacing in the end arm region, corona, inadequate clearance in the ring bus or end arm region, or several other possible reasons.

Refer to off-line PD testing for more information.


4.6    DC Ramped Overvoltage Test

DC testing results in the highest stress levels on the insulation system in the end arm region. Typical maintenance levels are 1.25-1.50E (E = Rated line to line voltage). Testing provides some assurance that the winding insulation has a minimum level of electrical strength required for continued operation. Testing is performed in accordance with the requirements of IEEE 95 on each phase using a 1 to 2 KV/min ramping rate, with the remaining phases grounded.

4.6.1    Test Parameters

Typical maintenance levels are 1.25E1.7 to 1.50E1.7 (E = Rated line to line voltage).

The line ends of the stator windings under test and the neutral ends of the windings under test must be connected to each other whenever practical. This will minimize possible damaging surges in the event of failure or flashover during testing. Where a connection between line and neutral is very difficult, the test may be made by connecting the supply to only one end of the winding. Examples of stator test connections are shown in the figure below.

During three (3) phase testing: The line end connectors should be connected together and the star point should be intact.

During single (1) phase testing: The line end and neutral end conductors of the phases not under test must be solidly grounded.


4.6.2    Test Procedure

1.   Raise the test voltage slowly from zero to the selected voltage. Voltage ramp rates are typically 1 to 2 kV per minute. The initial insulation resistance test performed at 5 kV can be used to estimate current requirements at the target test voltage.

2.   Once the selected voltage has been reached, the applied voltage is held on the test object for a period of one minute.

3.   Upon completion of the test the test set output supply voltage control should be slowly reduced to zero over a period of 10 seconds. It is not advisable to cause a step change in the applied test voltage. It must be recognized that eliminating the test source will not remove the stored charge from the winding. The voltage should be allowed to decay to half the final applied voltage through the series resistance of the test set. The winding should then be discharged to ground through the discharge resistor of the test set or resistive grounding stick (minimum 1kΩ-2kΩ per kV maximum test voltage). Once the winding capacitance has been fully discharged, the winding should be solidly grounded.

4.   The ground connection should be kept in place until the absorbed charge is completely dissipated. This may take several hours. Grounding which may be left unattended after completion of testing should be appropriately tagged with the purpose and importance of the grounding.

4.6.3    Analysis Tips

I would suggest reviewing “30 years of Ramp DC testing Hydrogenerator Stator Windings test results and interpretations”, Eric Eastment – USBR and Bert Milano – Consultant, 2009 Doble Client Conference.

The DC test voltage is not sufficient to stress the slot section of a stator winding to the same extent as an AC test because it is limited by the end arm region of the winding. In normal operation the surface of an end arm winding is left floating while the grading section is designed to gradually drain away this surface charge. Surface potentials are controlled by capacitance and can be ¾ of copper voltage during normal operation. However, with a contaminated machine, the end arm surface becomes a better conductor and extends the ground plane further out into the less consolidated insulation system located here. This increases stress across the insulation by resistively grading the surface voltage. Experimentation demonstrated the slot section could safety withstand voltages that would rupture the end arm region. The end arm region is also more prone to mechanical damage and cracking. Contamination in these flaws sometimes results in a failure during DC testing.

The response, and the total leakage current at test voltage are helpful in analyzing the condition of the insulation system and can be trended over time.

  • Careful record keeping will allow you to observe the base deterioration taking place within the insulation system and increases as a result of the contamination occurring.
  • Conversion of these leakage currents into resistances is a useful tool during analysis.
  • Plotting of the leakage current over the life of the machine (after correction to 40°C) will allow recognition of some problems. Increases in leakage currents may be the result insulation deterioration, contamination, or cracking.
  • Comparison of linearity of testing from 5 kV to 29 kV will give indication if there are some non-linear affects taking place which will require further investigation.
  • Conversion of leakage current into equivalent insulation resistance at rated operating temperature will give some insight to the stress levels occurring.
  • Knee’s in the leakage current are always a bad indication that should be carefully reviewed. Occasionally they can occur when the air gap is too small.


4.7    Winding Resistance

Winding resistance testing can detect the presence of any high resistance joints, corrosion, or fractures of the conductors. The DC winding resistance of each phase is measured using a Kelvin bridge in accordance with the requirements of IEEE 62.2.

4.7.1    Test Parameters

Each phase can be tested individually when the neutral is separated. Otherwise, the phase resistance can be calculated by measuring the phase to phase resistance.

Testing is sensitive to changes in temperature.

  • Testing should be performed when entire winding is at a uniform temperature.
  • Testing duration should be sufficiently short to prevent self-heating effects within the winding.
  • Using the instruction manual as a guide, the four leads should be connected to the circuit being measured. Two leads, one potential and one current (as described in the instruction manual) should be connected to each end of the circuit to be measured. Care should be taken to assure good contact of all lead connections as well as ensuring that all test leads are the same, i.e., length, gauge, and material.


Figure 7: Kelvin Bridge Test Connections

4.7.2    Test Procedure

1.   Record winding temperature using embedded temperature sensors.

2.   Connect the current leads and the voltage sensing leads directly to the machine terminals.

3.   Perform test measurement using DC current

4.   Reverse leads

5.   Repeat test.

6.   Repeat testing for all 3 connections.

4.7.3    Analysis Tips

Pay careful attention to aspects of the winding design which could include differences in conductor length, brazed connections and bolted connections.


4.8    Stator Slot Wedge Tightness:

The stator Slot Wedge Tightness of the machine will be checked, and areas of concern would be noted. Testing is performed in accordance with the requirements of IEEE 62.2

(Future)


4.9    Stator Winding Inspection

Visual Inspection of the stator winding assembly in accordance with the requirements of IEEE 62.2.

(Future)


4.10 Stator Core Low Energy (ElCID) Test (Removal of rotor required):

The condition of the interlaminar resistance between stator punchings of the machine core is evaluated. Testing is performed in accordance with the requirements of IEEE 62.2 using a digital ElCID test set and findings are recorded.

(Future)


4.11 Corona Camera or Ultrasonic Inspection (Complete inspection may require some machine disassembly):

Corona camera or ultrasonic testing is used to identify locations of PD with the end arm region of a stator winding. A visual scan of the end arm region of both ends of the stator is performed using the daylight corona camera and locations of partial discharge activity are noted. An audio scan can localize areas of partial discharge.

For the moment I would suggest looking at “Observations on the Detection and Possible Causes of Diffuse Optical Emissions on Stator Coils Subjected to AC Voltage” by Scott Cotner, Hydroelectric Design Center(Future), USACE, 2017 EIC, and “IEC TS 62478 - High voltage test techniques – Measurement of partial discharges by electromagnetic and acoustic methods”.